PPIVTR-D

Templates

Each record copies to the clipboard.

T1. Incident record, opened at verification

INCIDENT ID        :
TITLE              :
HANDLER            :
REPORTED           :            (date, time, zone)
REPORT SOURCE      :            user | alert | partner | hunt | third party
CLASSIFICATION     :            unauthorized access | phishing | malicious code |
                                data disclosure | account compromise |
                                public-facing exploit | other
INITIAL RISK       :            low | medium | high | critical
SUMMARY            :

EVIDENCE REFS      :

VERIFY DECISION    :            continue | stop | defer
RATIONALE          :
DECIDED BY / AT    :

T2. Triage brief to decision makers

INCIDENT ID        :
AS OF              :            (time of this brief)

WHAT WE KNOW       :            (facts only, three lines maximum)
  1.
  2.
  3.

WHAT WE DO NOT KNOW:
  1.
  2.

SYSTEMS IN SCOPE   :            (counts by class: servers, workstations, cloud, identities)
BUSINESS EXPOSURE  :            revenue | regulated data | safety | contractual
PROPOSED POSTURE   :            passive | adaptive | active | deceptive

ACTION REQUESTED   :            (the one authorization you need)
IF APPROVED        :            (impact)
IF DEFERRED        :            (impact)

DECISION / BY / AT :

T3. Containment decision record

INCIDENT ID        :
ACTION             :
SYSTEMS / ACCOUNTS :
LAYER              :            network | host | application | identity
TRIGGER            :            active destruction | exfiltration | safety |
                                regulatory clock | judgment call
POSTURE            :            passive | adaptive | active | deceptive
AUTHORIZED BY      :            (per authority matrix)
BUSINESS IMPACT    :            (assessed before execution)
EXECUTED AT        :            (simultaneous across teams where possible)
ROLLBACK PROCEDURE :

VALIDATION
  network          :            pass | fail  -  what was checked
  process          :            pass | fail  -  what was checked
  logs             :            pass | fail  -  what was checked
VALIDATED BY / AT  :

T4. Loop iteration log

INCIDENT ID        :
ITERATION #        :
OPENED AT          :
TRIGGER TYPE       :            new indicator | scope expansion |
                                incomplete eradication | analysis revelation |
                                business change
TRIGGER DETAIL     :

CHANGES TO
  scope            :
  containment      :
  eradication      :
  recovery         :

NEW INDICATORS     :
CLOSED AT          :
CARRIED FORWARD    :            (what the next iteration inherits)

T5. Technical closure

INCIDENT ID        :
ITERATIONS RUN     :

No new indicators in scoping since   :
Monitoring clean since               :
Eradication verified                 :   method / analyst / date
Restored systems nominal since       :
Outstanding visibility gaps          :
Monitoring retained, and for how long:

TECHNICAL CLOSURE BY :          (name, role)
DATE / TIME          :

T6. Residual risk acceptance

INCIDENT ID        :

RESIDUAL RISKS ACCEPTED        (one line each, plain language)
  1.
  2.
  3.

COMPENSATING CONTROLS RETAINED :
CONDITIONS THAT WOULD REOPEN   :
  1.
  2.

ACCEPTED BY        :            (name, role - the risk owner, not the IR team)
DATE / TIME        :

T7. Pre-restoration sign-off

INCIDENT ID        :          SYSTEM :

CHECK                          RESULT    BY        DATE
1 Root cause remediated        pass/fail
2 Patching current             pass/fail
3 Persistence removed          pass/fail
4 Backup predates compromise   pass/fail/na
5 Rebuild from trusted media   pass/fail/na
6 EDR, firewall, logging live  pass/fail
7 Indicator scan (run last)    pass/fail

EXCEPTIONS ACCEPTED :
VERIFIED BY / AT    :

T8. System owner acceptance

INCIDENT ID        :          SYSTEM :
OWNER              :

TESTS PERFORMED    :
PERFORMED BY       :
ISSUES FOUND       :
LIMITATIONS ACCEPTED BY OWNER  :
ENHANCED MONITORING CONFIRMED  :   yes | no
DETECTION RULES ENABLED        :   yes | no

OWNER SIGN-OFF     :            (name, role)
DATE / TIME        :

T9. After-action review agenda, 90 minutes

INCIDENT           :          DATE :
ATTENDEES          :            (every team that took part)

0:00  Ground rules. Blameless. Controls, procedures, resources.
      Individual performance is handled elsewhere.
0:05  Timeline walkthrough (prepared in advance)
0:30  What worked, and why
0:45  What slowed us down
1:05  Root cause, and the organizational conditions behind it
1:20  Candidate improvements, ranked by risk reduction
1:30  Owners and dates assigned

DECISIONS          :
IMPROVEMENTS + OWNERS + DATES   :
  1.
  2.
  3.

T10. Executive debrief, one page

INCIDENT           :          DATE :
CLASSIFICATION     :          SEVERITY :

WHAT HAPPENED      :            (three sentences, no jargon)

IMPACT
  systems          :
  accounts         :
  records / data   :
  downtime         :
  cost to date     :

HOW IT ENDED       :
ROOT CAUSE         :

WHAT WE ARE CHANGING            (owner and date on each)
  1.
  2.
  3.

WHAT WE NEED       :            (funding, staff, policy - ask now)